MGVCL Exam Paper (30-07-2021 Shift 3)
Fill in the blanks with suitable Article from the given alternatives. Everyone is ready to accept ____ new rules framed by the executive body
Bus Type - Known Parameter - Unknown Parameter Load Bus -P, Q - V, phase angle Generator Bus - P, V (magnitude) - Q, Voltage phase angle Slack Bus Voltage - magnitude and phase angle - P, Q
Value of power factor is varies from 0 to 1. R→PF = 1 L→PF = 0 lag C→PF = 0 lead R-L→0 lag < PF < 1 R-C→0 lead < PF < 1 R-C-L→depends on value of R, L and C. PF = R/Z
Advanced metering infrastructure (AMI) is an integrated system of smart meters, communications networks, and data management systems that enables two-way communication between utilities and customers. The goal of an AMI is to: Provides utility companies with real-time data about power consumption and allow customers to make informed choices about energy usage based on the price at the time of use.
Points should be consider for new transformer installation: Location Environmental impact Soils condition Survey of land Ventilation Grounding Wiring Fluid check Inspection