MGVCL Exam Paper (30-07-2021 Shift 3)
Fill in the blanks with suitable Article from the given alternatives. Everyone is ready to accept ____ new rules framed by the executive body
The capacity factor is the ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period. Nuclear power plants are at the high end of the range of capacity factors