Engineering Economics Pick up the correct method adopted for developing the approximate or conceptual estimates from the following: All of these Cost per function method Base unit method Cost per square metre All of these Cost per function method Base unit method Cost per square metre ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics Pick up the element of the cost from the following: Over head Direct material All of these Direct labour Over head Direct material All of these Direct labour ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics Pick up the ratio which gives us sufficient information by which to judge the financial condition and performance of the firm, from the following: Liquidity ratio Financial leverage ratio None of these Activity ratio Liquidity ratio Financial leverage ratio None of these Activity ratio ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics Pick up the method used for project evaluation and selection in capital budgeting from the following: Internal ratio of return Payback period Net present worth All listed here Internal ratio of return Payback period Net present worth All listed here ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics Pick up the correct reason for making conceptual (or preliminary) estimate from the following: To compute target estimate for the owner while drawing and specifications are in initial stage To have a check on a definitive cost estimate All of these To check quotations from contractors and/or sub-contractors To compute target estimate for the owner while drawing and specifications are in initial stage To have a check on a definitive cost estimate All of these To check quotations from contractors and/or sub-contractors ANSWER DOWNLOAD EXAMIANS APP