Engineering Economics Pick up the correct method adopted for developing the approximate or conceptual estimates from the following: All of these Cost per function method Base unit method Cost per square metre All of these Cost per function method Base unit method Cost per square metre ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics Pick up the element of the cost from the following: All of these Over head Direct material Direct labour All of these Over head Direct material Direct labour ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics Pick up the ratio which gives us sufficient information by which to judge the financial condition and performance of the firm, from the following: Activity ratio None of these Liquidity ratio Financial leverage ratio Activity ratio None of these Liquidity ratio Financial leverage ratio ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics Pick up the method used for project evaluation and selection in capital budgeting from the following: Net present worth Payback period Internal ratio of return All listed here Net present worth Payback period Internal ratio of return All listed here ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics Pick up the correct reason for making conceptual (or preliminary) estimate from the following: To have a check on a definitive cost estimate To check quotations from contractors and/or sub-contractors All of these To compute target estimate for the owner while drawing and specifications are in initial stage To have a check on a definitive cost estimate To check quotations from contractors and/or sub-contractors All of these To compute target estimate for the owner while drawing and specifications are in initial stage ANSWER DOWNLOAD EXAMIANS APP