Manufacturing And Production Technology During the execution of a CNC part program block NO20 GO2 X45.0 Y25.0 R5.0 ; the type of tool motion will be Linear Interpolation Circular Interpolation − counter clockwise Rapid feed Circular Interpolation − clockwise Linear Interpolation Circular Interpolation − counter clockwise Rapid feed Circular Interpolation − clockwise ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology Side relief angle of a single point tool is the angle Between the surface of the flank immediately below the point and a line drawn from the point perpendicular to the base Between the surface of the flank immediately below the point and a plane at right angles to the centre line of the point of tool By which the face of the tool is inclined sideways By which the face of the tool is inclined towards back Between the surface of the flank immediately below the point and a line drawn from the point perpendicular to the base Between the surface of the flank immediately below the point and a plane at right angles to the centre line of the point of tool By which the face of the tool is inclined sideways By which the face of the tool is inclined towards back ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology The cutting tool in a milling machine is mounted on Knee Arbor Column Spindle Knee Arbor Column Spindle ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology When the end of a tap is tapered for about three or four threads, it is known as a Bottoming tap Taper tap Second tap None of these Bottoming tap Taper tap Second tap None of these ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology Crater wear is mainly due to the phenomenon known as Oxidation of metals All of these Diffusion of metals Adhesion of metals Oxidation of metals All of these Diffusion of metals Adhesion of metals ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology It is required to cut screw threads of 2 mm pitch on a lathe. The lead screw has a pitch of 6 mm. If the spindle speed is 60 r.p.m., then the speed of lead screw will be 20 r.p.m. 180 r.p.m. 10 r.p.m. 120 r.p.m. 20 r.p.m. 180 r.p.m. 10 r.p.m. 120 r.p.m. ANSWER DOWNLOAD EXAMIANS APP