Surveying Dumpy level is most suitable when many readings are to be taken from a single setting of the instrument All of these fly levelling is being done over long distance the instrument is to be shifted frequently many readings are to be taken from a single setting of the instrument All of these fly levelling is being done over long distance the instrument is to be shifted frequently ANSWER DOWNLOAD EXAMIANS APP
Surveying International Date Line is located along Greenwich meridian Equator 180° longitude Standard meridian Greenwich meridian Equator 180° longitude Standard meridian ANSWER DOWNLOAD EXAMIANS APP
Surveying For accurate work, the steel band should always be used in preference to chain because the steel band can be easily repaired in the field is practically inextensible and is not liable to kinks when in use is lighter than chain is easier to handle can be easily repaired in the field is practically inextensible and is not liable to kinks when in use is lighter than chain is easier to handle ANSWER DOWNLOAD EXAMIANS APP
Surveying The great circle whose plane is perpendicular to the axis of rotation of the earth, is called 0° latitude All of these Terrestrial equator Equator 0° latitude All of these Terrestrial equator Equator ANSWER DOWNLOAD EXAMIANS APP
Surveying The average eye base is assumed as 64 mm 58 mm 60 mm 62 mm 64 mm 58 mm 60 mm 62 mm ANSWER DOWNLOAD EXAMIANS APP
Surveying The correction applied to the measured base of length ‘L’ is Slope = (h²/2L) + (h⁴/8L³) where h is height difference of end supports Sag = L³w²/24P² where w is the weight of tape/m Tension = (P - Ps)L/AE All of these Slope = (h²/2L) + (h⁴/8L³) where h is height difference of end supports Sag = L³w²/24P² where w is the weight of tape/m Tension = (P - Ps)L/AE All of these ANSWER DOWNLOAD EXAMIANS APP