Industrial Engineering and Production Management Critical path moves along the activities having total float of Same value Positive value Zero value Negative value Same value Positive value Zero value Negative value ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which one of the following chart gives simultaneously information about the progress of work and machine loading? Machine load chart Gantt chart Process chart Man-machine chart Machine load chart Gantt chart Process chart Man-machine chart ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The process capability of a machine is defined as the capability of the machine to Produces a definite volume of work per minute Perform definite number of operations Produce job at a definite spectrum of speed Holds a definite spectrum of tolerance and surface finish Produces a definite volume of work per minute Perform definite number of operations Produce job at a definite spectrum of speed Holds a definite spectrum of tolerance and surface finish ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The time of completing a project in network analysis is given by following time of the critical activity meeting at the final triode Late start Early start Early finish Late finish Late start Early start Early finish Late finish ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A dummy activity Is artificially introduced Is represented by a dotted line All of the these Does not require any time Is artificially introduced Is represented by a dotted line All of the these Does not require any time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Material handling and plant location is analysed by Gantt chart Emerson chart Travel chart Bin chart Gantt chart Emerson chart Travel chart Bin chart ANSWER DOWNLOAD EXAMIANS APP