Industrial Engineering and Production Management Critical path moves along the activities having total float of Zero value Negative value Same value Positive value Zero value Negative value Same value Positive value ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In manufacturing management, the term 'Dispatching' is used to describe Dispatch of work orders through shop floor Dispatch of sales order Dispatch of finished product of the user Dispatch of factory mail Dispatch of work orders through shop floor Dispatch of sales order Dispatch of finished product of the user Dispatch of factory mail ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In PERT analysis, critical path is obtained by joining events having Zero slack +ve slack -ve slack Dummy activities Zero slack +ve slack -ve slack Dummy activities ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Pick up the correct statement. Dummy activity on a PERT/CPM chart means, it Consumes resources but no time Is a dangling event Consumes time, but no resources Consumes neither time nor resources Consumes resources but no time Is a dangling event Consumes time, but no resources Consumes neither time nor resources ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A PERT network has three activities on critical path with mean time 3, 8 and 6 and standard deviations 1, 2 and 2 respectively. The probability that the project will be completed in 20 days is 0.95 0.84 0.66 0.5 0.95 0.84 0.66 0.5 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management CPM stands for Common Planning Method Combined Process Method Critical Process Method Critical Path Method Common Planning Method Combined Process Method Critical Process Method Critical Path Method ANSWER DOWNLOAD EXAMIANS APP