Industrial Engineering and Production Management Critical path moves along the activities having total float of Negative value Positive value Zero value Same value Negative value Positive value Zero value Same value ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Standard time is equal to Representative time multiplied by rating factor (Normal time) + (allowances) Normal time taken by an operation (Normal time) - (allowances) Representative time multiplied by rating factor (Normal time) + (allowances) Normal time taken by an operation (Normal time) - (allowances) ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Material handling and plant location is analysed by Emerson chart Bin chart Gantt chart Travel chart Emerson chart Bin chart Gantt chart Travel chart ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The interchangeability can be achieved by Better product planning Bonus plan Standardization Better process planning Better product planning Bonus plan Standardization Better process planning ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management An event is indicated on the network by A straight line A number enclosed in a circle or a square A dotted line A straight line with circles at the ends A straight line A number enclosed in a circle or a square A dotted line A straight line with circles at the ends ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Halsey 50-50 plan, wages for the job will be TR TR + (S - T) × R TR + [(S - T)/S] × R TR + [(S - T)/2] × R TR TR + (S - T) × R TR + [(S - T)/S] × R TR + [(S - T)/2] × R ANSWER DOWNLOAD EXAMIANS APP