Power Systems Capacitance voltage transformer ( CVT ) is used to improve the power factor of the transmission. connect instruments on the LT side. reduce losses in a transmission line. none of these. improve the power factor of the transmission. connect instruments on the LT side. reduce losses in a transmission line. none of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The receiving end voltage for a long line under no load condition is more than the sending end voltage equal to the sending end voltage less than the sending end voltage any of the above more than the sending end voltage equal to the sending end voltage less than the sending end voltage any of the above ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following are the fissile materials U235, U233 and Pu239. None of these. U238 and Th232. U235 and Th239. U235, U233 and Pu239. None of these. U238 and Th232. U235 and Th239. ANSWER DOWNLOAD EXAMIANS APP
Power Systems On a power system network the load is increasing represents the value of impedance decrease. increase. none of above. remains constant. decrease. increase. none of above. remains constant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Ferranti effect occurs under no load full load half load any of the above no load full load half load any of the above ANSWER DOWNLOAD EXAMIANS APP
Power Systems Pumped storage plant is a peak load plant both 1 and 2 base load plant None of these peak load plant both 1 and 2 base load plant None of these ANSWER DOWNLOAD EXAMIANS APP