Concrete Technology and Design of Concrete Structures Bulking of sand is maximum if moisture content is about 5% 7% 4% 6% 5% 7% 4% 6% ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures If a beam fails in bond, then its bond strength can be increased most economi-cally by using thinner bars but more in number providing vertical stirrups using thicker bars but less in number increasing the depth of beam using thinner bars but more in number providing vertical stirrups using thicker bars but less in number increasing the depth of beam ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures Due to shrinkage stresses, a simply supported beam having reinforcement only at bottom tends to None of these Deflect downward Deflect downward or upward Deflect upward None of these Deflect downward Deflect downward or upward Deflect upward ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures Shrinkage of concrete depends uponi) humidity of atmosphereii) passage of timeiii) stressThe correct answer is All (i), (ii) and (iii) (i) and (ii) (ii) and (iii) only (iii) All (i), (ii) and (iii) (i) and (ii) (ii) and (iii) only (iii) ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures In a ring beam subjected to uniformly distributed loadi) shear force at mid span is zeroii) shear force at mid span is maximumiii) torsion at mid span is zeroiv) torsion at mid span is maximumThe correct answer is (i) and (iii) (ii) and (iv) (i) and (iv) (ii) and (iii) (i) and (iii) (ii) and (iv) (i) and (iv) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures Select the incorrect statement... None of these Pretensioning system has greater certainty about its durability. The loss of prestress is more in pre-tensioning system than in post-tensioning system. For heavy loads and large spans in buildings or bridges, post-tensioning system is cheaper than pretensioning system None of these Pretensioning system has greater certainty about its durability. The loss of prestress is more in pre-tensioning system than in post-tensioning system. For heavy loads and large spans in buildings or bridges, post-tensioning system is cheaper than pretensioning system ANSWER DOWNLOAD EXAMIANS APP