Concrete Technology and Design of Concrete Structures Bulking of sand is maximum if moisture content is about 4% 7% 5% 6% 4% 7% 5% 6% ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures In case of hand mixing of concrete, the extra cement to be added is 10% 5% 20% 15% 10% 5% 20% 15% ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures The ratio of the diameter of reinforcing bars and the slab thickness is 1/4 1/8 1/5 1/6 1/4 1/8 1/5 1/6 ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures Minimum grade of concrete to be used in reinforced concrete as per IS:456-1978 is M25 M20 M15 M10 M25 M20 M15 M10 ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures Select the incorrect statement... The loss of prestress is more in pre-tensioning system than in post-tensioning system. For heavy loads and large spans in buildings or bridges, post-tensioning system is cheaper than pretensioning system Pretensioning system has greater certainty about its durability. None of these The loss of prestress is more in pre-tensioning system than in post-tensioning system. For heavy loads and large spans in buildings or bridges, post-tensioning system is cheaper than pretensioning system Pretensioning system has greater certainty about its durability. None of these ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures High carbon content in the steel causes increase in tensile strength but decrease in ductility decrease in tensile strength but increase in ductility decrease in both tensile strength and ductility increase in both tensile strength and ductility increase in tensile strength but decrease in ductility decrease in tensile strength but increase in ductility decrease in both tensile strength and ductility increase in both tensile strength and ductility ANSWER DOWNLOAD EXAMIANS APP