Concrete Technology and Design of Concrete Structures Which of the following has high tensile strength ? heat treated rolled wires plain hot rolled wires cold drawn wires all have same tensile strength heat treated rolled wires plain hot rolled wires cold drawn wires all have same tensile strength ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures Select the incorrect statement... None of these The loss of prestress is more in pre-tensioning system than in post-tensioning system. Pretensioning system has greater certainty about its durability. For heavy loads and large spans in buildings or bridges, post-tensioning system is cheaper than pretensioning system None of these The loss of prestress is more in pre-tensioning system than in post-tensioning system. Pretensioning system has greater certainty about its durability. For heavy loads and large spans in buildings or bridges, post-tensioning system is cheaper than pretensioning system ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures The main reason for providing number of reinforcing bars at a support in a simply supported beam is to resist in that zone shear stress bond stress tensile stress compressive stress shear stress bond stress tensile stress compressive stress ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures Prestress loss due to friction occurs only in pretensioned beams None of these in both post-tensioned and preten-sioned beams only in post-tensioned beams only in pretensioned beams None of these in both post-tensioned and preten-sioned beams only in post-tensioned beams ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures Poisson’s ratio for concrete remains constant None of these decreases with richer mixes increases with richer mixes remains constant None of these decreases with richer mixes increases with richer mixes ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures The critical section for finding maximum bending moment for footing under masonry wall is located halfway between the middle and edge of the wall at a distance equal to effective depth of footing from the edge of the wall at the middle of the wall at the edge of the wall halfway between the middle and edge of the wall at a distance equal to effective depth of footing from the edge of the wall at the middle of the wall at the edge of the wall ANSWER DOWNLOAD EXAMIANS APP