Irrigation Engineering Bed bars in a canal are provided To watch the general behavior of canal To measure the discharge To raise the supply level To control the silting To watch the general behavior of canal To measure the discharge To raise the supply level To control the silting ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering To control the silt entry into a distributary at head regulator, King's vanes are provided which are the walls All listed here Of height ⅓rd to ¼th the depth of water in the main canal Spaced at interval of 1½ times their heights Of R.C.C. or steel plate 8 cm thick All listed here Of height ⅓rd to ¼th the depth of water in the main canal Spaced at interval of 1½ times their heights Of R.C.C. or steel plate 8 cm thick ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A deficit of sediments in flowing water may cause a river Sub-critical type Meandering type Aggrading type Degrading type Sub-critical type Meandering type Aggrading type Degrading type ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering According to Lacey, depth of scour in a river depends upon the straightness of the reach. If D is the depth of scour in regime flow in a right angled bend, it is 2.00 D 1.75 D 1.50 D 1.25 D 2.00 D 1.75 D 1.50 D 1.25 D ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The best unit duration of storm for a unit hydrograph is one-fourth of basin lag 1 hour one-half of basin lag equal to basin lag one-fourth of basin lag 1 hour one-half of basin lag equal to basin lag ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A 6 hours storm had 4 cm of rainfall and the resulting runoff was 2 cm. If 4.5 cm 6.0 cm 5 cm 4 cm 4.5 cm 6.0 cm 5 cm 4 cm ANSWER DOWNLOAD EXAMIANS APP