System Analysis and Design An appraisal, of a system's performance after it has been installed, is called system maintenance review batch Processing planning maintenance review batch Processing planning ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Most algorithms follow the format of Entering the input items, then processing the output items, and then displaying the output items Entering the input items, then processing the input items, and then displaying the output items Entering the output items, then processing the output items, and then displaying the output items Entering the output items, then displaying the output items, and then processing the output items Entering the input items, then displaying the input items, and then processing the output items Entering the input items, then processing the output items, and then displaying the output items Entering the input items, then processing the input items, and then displaying the output items Entering the output items, then processing the output items, and then displaying the output items Entering the output items, then displaying the output items, and then processing the output items Entering the input items, then displaying the input items, and then processing the output items ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Which of the following is not a factor in the failure of a systems development project ? failure of systems integration size of company continuation of a project that should have been cancelled None of these inadequate user involvement failure of systems integration size of company continuation of a project that should have been cancelled None of these inadequate user involvement ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design A channel for communicating across a boundary between two or more sub-systems is known as actigram interface None of these walk through data path actigram interface None of these walk through data path ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design The main purpose of the system investigation phase is to produce All of these a feasibility report a requirement report None of these a design report All of these a feasibility report a requirement report None of these a design report ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Which of the following is an integrated collection of data with minimum redundancy, so that different applications can use the required data. records DBMS schema file None of these records DBMS schema file None of these ANSWER DOWNLOAD EXAMIANS APP