Surveying Agate cap is fitted with a level cross staff prismatic compass chain level cross staff prismatic compass chain ANSWER DOWNLOAD EXAMIANS APP
Surveying Height of instrument method of levelling is more accurate than rise and fall method quicker and less tedious for large number of intermediate sights less accurate than rise and fall method None of these more accurate than rise and fall method quicker and less tedious for large number of intermediate sights less accurate than rise and fall method None of these ANSWER DOWNLOAD EXAMIANS APP
Surveying The error due to eccentricity of inner and outer axes can be eliminated by taking mean of several readings distributed over different portions of the graduated circle reading both verniers and taking the mean of the two double sighting taking both face observations and taking the mean of the two taking mean of several readings distributed over different portions of the graduated circle reading both verniers and taking the mean of the two double sighting taking both face observations and taking the mean of the two ANSWER DOWNLOAD EXAMIANS APP
Surveying The net ground area of a vertical photograph 20 cm × 20 cm on scale 1 : 10,000 having overlaps 60% and 30%, is 0.50 sq km 0.64 sq km 0.56 sq km 0.60 sq km 0.50 sq km 0.64 sq km 0.56 sq km 0.60 sq km ANSWER DOWNLOAD EXAMIANS APP
Surveying Pick up the incorrect statement from the following. In a spherical triangle Sum of the three angles is equal to two right angles Sum of any two sides is greater than the third Sum of the three angles less than six right angles and greater than two right angles Every angle is less than two right angles Sum of the three angles is equal to two right angles Sum of any two sides is greater than the third Sum of the three angles less than six right angles and greater than two right angles Every angle is less than two right angles ANSWER DOWNLOAD EXAMIANS APP
Surveying Check lines (or proof lines) in Chain Surveying, are essentially required To indicate the accuracy of the survey work To plot the offsets To increase the out-turn To plot the chain lines To indicate the accuracy of the survey work To plot the offsets To increase the out-turn To plot the chain lines ANSWER DOWNLOAD EXAMIANS APP