DGVCL Exam Paper (11-12-2011) A fuse is inserted in Phase wire Earth continuity conductor Neutral wire Both phased and neutral wire Phase wire Earth continuity conductor Neutral wire Both phased and neutral wire ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) Bulk power transmission over long HVDC lines are preferred on account of Simple protection Minimum line power losses No harmonic problems Low cost of HVDC terminals Simple protection Minimum line power losses No harmonic problems Low cost of HVDC terminals ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) The insulation coordination for UHV lines (above 500 kV) is done based on Lightning and switching surges Switching surges Voltage level of the line Lightning surges Lightning and switching surges Switching surges Voltage level of the line Lightning surges ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) If a relay fails to operate inspite of a fault in its own zone of protection, it is said to Pick up Under reach Reach Over reach Pick up Under reach Reach Over reach ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) Which type of back up protection is widely used for the protection of transmission lines? Relay backup Remote backup Control backup Breaker backup Relay backup Remote backup Control backup Breaker backup ANSWER DOWNLOAD EXAMIANS APP