Irrigation Engineering A fall in a canal bed is generally provided, if None of these Ground slope exceeds the designed bed slope Designed bed slope exceeds the ground slope Ground slope is practically the same as the designed bed slope None of these Ground slope exceeds the designed bed slope Designed bed slope exceeds the ground slope Ground slope is practically the same as the designed bed slope ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The level of the floor of a syphon aqueduct can be obtained By subtracting the thickness of culvert plus the depth of the culvert from the canal bed level None of these By subtracting the depth of the culvert from the canal bed level Both (a) and (b) By subtracting the thickness of culvert plus the depth of the culvert from the canal bed level None of these By subtracting the depth of the culvert from the canal bed level Both (a) and (b) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The flow of water after spilling over the weir crest in chute spillway and side channel spillway respectively are At right angle and parallel to weir crest Parallel and at right angle to weir crest Parallel to weir crest in both At right angle to weir crest in both At right angle and parallel to weir crest Parallel and at right angle to weir crest Parallel to weir crest in both At right angle to weir crest in both ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Effective precipitation for a crop may be defined as Total precipitation minus the loss due to evaporation Total precipitation minus the loss due to infiltration Total precipitation during the crop period Available water stored in soil within root zone of the crop Total precipitation minus the loss due to evaporation Total precipitation minus the loss due to infiltration Total precipitation during the crop period Available water stored in soil within root zone of the crop ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The crest level of a canal diversion head work, depends upon Pond level Discharge perimeters F.S.L. of the canal All listed here Pond level Discharge perimeters F.S.L. of the canal All listed here ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The normal annual precipitation at stations X, A, B and C are 700 mm, 1000 mm, 900 mm and 800 mm respectively. If the storm precipitation at three station A, B and C were 100 mm, 90 mm and 80 mm respectively, then the storm precipitation for station X will be 90 mm 70mm 80mm 105 mm 90 mm 70mm 80mm 105 mm ANSWER DOWNLOAD EXAMIANS APP