Process Equipment and Plant Design A binary liquid azeotropic mixture has boiling point higher than either of the components, when it shows __________ deviation from Raoult's Law. Negative None of these Positive No Negative None of these Positive No ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design For turbulent flow (NRe > 2100) of low viscosity fluid (μ > 20cp) in steel pipes, the optimum inside pipe diameter is given by(where, Q = fluid flow rate, ft³/sec.ρ = fluid density, lb/ft³ μ = fluid viscosity, centipoise Di = optimum inside pipe diameter, inches) Di, opt = 3.9 Q0.45 ρ0.13 Di, opt = 4.7 Q0.36 . μ3.2ρ0.13 Di, opt = 3.9 Q0.45 . μ0.95 Di, opt = 3 Q0.36 . μ0.88 Di, opt = 3.9 Q0.45 ρ0.13 Di, opt = 4.7 Q0.36 . μ3.2ρ0.13 Di, opt = 3.9 Q0.45 . μ0.95 Di, opt = 3 Q0.36 . μ0.88 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Width and depth of grooves in the tube sheet holes normally are __________ inch respectively. 1/2 and 8 1/2 and 5 1/64 and 1/8 1/8 and 1/64 1/2 and 8 1/2 and 5 1/64 and 1/8 1/8 and 1/64 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design 1.2 to 3.8 cms is the value of the All of these Downcomer liquid seal in case of a balanced tray design Skirt clearance for bubble caps Static submergence in case of a bubble cap tray for column operating under pressure (≥ 1 atm.) All of these Downcomer liquid seal in case of a balanced tray design Skirt clearance for bubble caps Static submergence in case of a bubble cap tray for column operating under pressure (≥ 1 atm.) ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Any shell opening greater than 5 cms for a storage tank must be reinforced for reason of Making the joint leak proof None of these Reduction of discontinuity in shape at the junction Preventing the local overstressing of the shell around the opening Making the joint leak proof None of these Reduction of discontinuity in shape at the junction Preventing the local overstressing of the shell around the opening ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In perforated plate towers, the Total hole area may be around 6 to 15% of tower cross-sectional area Pressure drop is less compared is similar bubble cap towers All of these Hole sizes may be around 1/8" or 3/16" Total hole area may be around 6 to 15% of tower cross-sectional area Pressure drop is less compared is similar bubble cap towers All of these Hole sizes may be around 1/8" or 3/16" ANSWER DOWNLOAD EXAMIANS APP