Power Systems
Zero voltage regulation is possible only for

All of these
 lagging power factor
 unity power factor
 leading power factor

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In hydroelectric power plants

 operating cost is high and initial cost is low.
 both operating and initial cost are low.
  operating cost is low and initial cost is high.
 both operating and initial cost are high.

ANSWER DOWNLOAD EXAMIANS APP