Power Systems Zero voltage regulation is possible only for unity power factor lagging power factor All of these leading power factor unity power factor lagging power factor All of these leading power factor ANSWER DOWNLOAD EXAMIANS APP
Power Systems A sort line with R/X ratio 1, the zero regulation is obtained when the power factor of the load is unity 0.5 0.707 leading 0 leading unity 0.5 0.707 leading 0 leading ANSWER DOWNLOAD EXAMIANS APP
Power Systems To protect the power transformer ( Y-Y with neutral grounded) against fault, which type of connection do the current transformers have? Y-Δ connection Δ-Δ connection Y-Y connection Δ-Y connection Y-Δ connection Δ-Δ connection Y-Y connection Δ-Y connection ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generated station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 10 MW 5 MW 6 MW 12 MW 10 MW 5 MW 6 MW 12 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The most suitable circuit breaker for short line fault without switching resistor is air blast circuit breaker. none of these. SF6 breaker. oil circuit breaker. air blast circuit breaker. none of these. SF6 breaker. oil circuit breaker. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The main objectives of power system is/are Flexible power has to be available. All of these Cost of electrical energy per KWh is to be minimum Reliable power has to be available Flexible power has to be available. All of these Cost of electrical energy per KWh is to be minimum Reliable power has to be available ANSWER DOWNLOAD EXAMIANS APP