Economics of Power Generation ________ will be least affected due to charge in supply voltage frequency. Ceiling fan Room heater Electric clock Mixer grinder Ceiling fan Room heater Electric clock Mixer grinder ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation If C is the capacitance per phase for delta connected capacitor bank, then capacitance per phase for star connected the capacitor bank is C/√3 C/3 √3C 3C C/√3 C/3 √3C 3C ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The expected useful life of an hydroelectric power station is around 60 years 15 years 30 years 100 years 60 years 15 years 30 years 100 years ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Generating capacity connected to the busbars and ready to take load when switched on is known as Hot reserve Cold reserve Spinning reserve Firm power Hot reserve Cold reserve Spinning reserve Firm power ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Is the reserved generating capacity available for service under emergency conditions which is not kept in operation but in working order, Cold reserve Hot reserve Firm power Spinning reserve Cold reserve Hot reserve Firm power Spinning reserve ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Load shedding is done to Run the equipment efficiency Reduce peak demand Improve power factor Repair the machine Run the equipment efficiency Reduce peak demand Improve power factor Repair the machine ANSWER DOWNLOAD EXAMIANS APP