Economics of Power Generation The smaller the lagging reactive power drawn by the circuit None of the listed here The higher is the active power The smaller is the p. f The higher is the p. f. None of the listed here The higher is the active power The smaller is the p. f The higher is the p. f. ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The area under load curve gives Maximum demand Average demand Energy consumed None of the listed here Maximum demand Average demand Energy consumed None of the listed here ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The straight line method for calculating depreciation is based on the assumption that depreciation charge is Is more in later years Is more in early years Constant every year Is less in early years Is more in later years Is more in early years Constant every year Is less in early years ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The annual deposit is _____ in sinking fund method as compared to straight line method. The same None of the listed here Greater Smaller The same None of the listed here Greater Smaller ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation In India production and distribution of electrical energy is confined to joint sector None of these public sector private sector government sectors joint sector None of these public sector private sector government sectors ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation ______ public sector undertaking is associated with erection and sometimes running of thermal power plants. NTPC BHEL BEL SAIL NTPC BHEL BEL SAIL ANSWER DOWNLOAD EXAMIANS APP