Automation System Which technique enables the designer to mold and shape, rather than construct on object using a series of lines? Solid modeling Surface modeling None of these Wire-frame modeling FEM (Finite Element Modeling) Solid modeling Surface modeling None of these Wire-frame modeling FEM (Finite Element Modeling) ANSWER DOWNLOAD EXAMIANS APP
Automation System When was the first successful industrial robot installed in the General Motors Plant in USA? 1961 1967 None of these 1960 1963 1961 1967 None of these 1960 1963 ANSWER DOWNLOAD EXAMIANS APP
Automation System Which of the methods below can be used to tell a robot what it is to do? Walk-through (a) and (c) None of these Set mechanical stops Software program Walk-through (a) and (c) None of these Set mechanical stops Software program ANSWER DOWNLOAD EXAMIANS APP
Automation System When a computer fetches an instruction, the binary code representing the instruction appears on the: input data bus I/O address bus output data bus memory data bus None of these input data bus I/O address bus output data bus memory data bus None of these ANSWER DOWNLOAD EXAMIANS APP
Automation System Which of the following symbol modes are used to input of graphics to General CAD system? Live and Rectangle mode Arc and Circle mode Dimension and Alphanumeric mode None of these All of these Live and Rectangle mode Arc and Circle mode Dimension and Alphanumeric mode None of these All of these ANSWER DOWNLOAD EXAMIANS APP
Automation System One advantage of a PC in industrial control is that it: has a reliable long life compared to relay logic is unreliable because there are no moving parts is very difficult for the inexperienced programmer to understand All of these None of these has a reliable long life compared to relay logic is unreliable because there are no moving parts is very difficult for the inexperienced programmer to understand All of these None of these ANSWER DOWNLOAD EXAMIANS APP