Power Systems Which of the following method is used for changing power factor from leading to lagging any of the above shunt capacitor shunt reactor series capacitor any of the above shunt capacitor shunt reactor series capacitor ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW for remaining 12 hours. If the load factor is 0.8. Find the reserve capacity of the station? 18 MW 9 MW 5 MW 10 MW 18 MW 9 MW 5 MW 10 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Resistance switching in normally employed in air blast circuit breaker. all breakers. minimum oil breakers. bulk oil breakers. air blast circuit breaker. all breakers. minimum oil breakers. bulk oil breakers. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A hydro power plant of run off river type should be provided with pondage so that the kinetic energy of the running water is fully utilized. firm capacity of plant is increased. pressure inside the turbine casing remains. operating head is controlled. kinetic energy of the running water is fully utilized. firm capacity of plant is increased. pressure inside the turbine casing remains. operating head is controlled. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Percentage of carbon is highest in coal gas. bituminous coal. anthracite coal. lignite coal. coal gas. bituminous coal. anthracite coal. lignite coal. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A coal fired steam power station working at a plant factor of 80% has one 500 MW generating unit. If the heat content of coal is 2 kWh/kg, the overall plant efficiency is 40% and a train load of coal is 2000 metric tons, then the number of trains required daily for the plant is 10 16 2 6 10 16 2 6 ANSWER DOWNLOAD EXAMIANS APP