Power Systems Which of the following method is used for changing power factor from leading to lagging any of the above shunt reactor series capacitor shunt capacitor any of the above shunt reactor series capacitor shunt capacitor ANSWER DOWNLOAD EXAMIANS APP
Power Systems A penstock is used as a condition between the heat ex-changer and the turbine in nuclear power plant. the turbine and discharge drain. none of above. the dam and the turbine in a hydro station. the heat ex-changer and the turbine in nuclear power plant. the turbine and discharge drain. none of above. the dam and the turbine in a hydro station. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following method is/are more reliable? Fast Decoupled Load Flow (FDLF) method Newton Raphson (NR) method All of these Gauss-Siedel (GS) method Fast Decoupled Load Flow (FDLF) method Newton Raphson (NR) method All of these Gauss-Siedel (GS) method ANSWER DOWNLOAD EXAMIANS APP
Power Systems The rating of fuse wire is always expressed in ampere-volts. ampere-hours. kWh. amperes. ampere-volts. ampere-hours. kWh. amperes. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Earth fault relay uses the which of the following sequence currents? zero sequence positive sequence negative sequence any of the above zero sequence positive sequence negative sequence any of the above ANSWER DOWNLOAD EXAMIANS APP
Power Systems For complete protection of 3-phase system from the short circuit faults minimum number of relays required are two one six three two one six three ANSWER DOWNLOAD EXAMIANS APP