Power Systems Which of the following method is used for changing power factor from leading to lagging any of the above shunt reactor series capacitor shunt capacitor any of the above shunt reactor series capacitor shunt capacitor ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station has a maximum demand of 15 MW. The plant capacity is 20 MW. Find the reserve capacity of the plant? 5 MW 20 MW 15 MW 10 MW 5 MW 20 MW 15 MW 10 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Nuclear fission means graphite. moderator. combination of two light nuclei. breaking up of nuclear of heavy atoms into nearly equal parts. graphite. moderator. combination of two light nuclei. breaking up of nuclear of heavy atoms into nearly equal parts. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A hydro power plant of run off river type should be provided with pondage so that the operating head is controlled. pressure inside the turbine casing remains. firm capacity of plant is increased. kinetic energy of the running water is fully utilized. operating head is controlled. pressure inside the turbine casing remains. firm capacity of plant is increased. kinetic energy of the running water is fully utilized. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For large plants of capacity for more than 15 MW, what type of cooling is used Air. Liquid. Water. Hydrogen. Air. Liquid. Water. Hydrogen. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Graphite is use din nuclear plant as a / an fuel. electrode. moderator. coolant. fuel. electrode. moderator. coolant. ANSWER DOWNLOAD EXAMIANS APP