Concrete Technology and Design of Concrete Structures Which of the following losses of prestress occurs only in pretensioning and not in post-tensioning ? elastic shortening of concrete loss due to friction creep of concrete shrinkage of concrete elastic shortening of concrete loss due to friction creep of concrete shrinkage of concrete ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures The design yield stress of steel according to IS: 456-1978 is (where fy is the characteristic yield strength of steel) 0.37 fy 0.57 fy 0.67 fy 0.87 fy 0.37 fy 0.57 fy 0.67 fy 0.87 fy ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures As compared to ordinary portland cement, high alumina cement has higher initial setting time but lower final setting time lower initial setting time but higher final setting time higher initial and final setting times lower initial and final setting times higher initial setting time but lower final setting time lower initial setting time but higher final setting time higher initial and final setting times lower initial and final setting times ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures The approximate value of the ratio between direct tensile strength and flexural strength is 0.75 0.5 1 0.33 0.75 0.5 1 0.33 ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures Air entrainment in the concrete increases workability the unit weight the effects of temperature variations strength workability the unit weight the effects of temperature variations strength ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures Strength of concrete increases with decrease in curing time increase in water-cement ratio decrease in size of aggregate increase in fineness of cement decrease in curing time increase in water-cement ratio decrease in size of aggregate increase in fineness of cement ANSWER DOWNLOAD EXAMIANS APP