Chemical Reaction Engineering Which of the following is used for calcination of limestone and dolomite in industrial practice? None of these Fixed bed reactor Moving bed reactor Fluidised bed reactor None of these Fixed bed reactor Moving bed reactor Fluidised bed reactor ANSWER DOWNLOAD EXAMIANS APP
Chemical Reaction Engineering With the same reaction time, initial concentration and feed rate, the reaction 2A → B is carried out separately in CSTR and P.F. reactor of equal volumes. The conversion will be Higher in CSTR Same in both the reactors Data insufficient; can't be predicted Higher in P.F. reactor Higher in CSTR Same in both the reactors Data insufficient; can't be predicted Higher in P.F. reactor ANSWER DOWNLOAD EXAMIANS APP
Chemical Reaction Engineering Half life period of a chemical reaction is proportional to CA0-1 , if the reaction is of __________ order. Second First Third Zero Second First Third Zero ANSWER DOWNLOAD EXAMIANS APP
Chemical Reaction Engineering If the time required to complete a definite fraction of reaction varies inversely as the concentration of the reactants, then the order of reaction is 1 3 2 1 3 2 ANSWER DOWNLOAD EXAMIANS APP
Chemical Reaction Engineering A first order reaction requires two equal sized CSTR. The conversion is More when they are connected in parallel More when they are connected in series Less when they are connected in series Same whether they are connected in series or in parallel More when they are connected in parallel More when they are connected in series Less when they are connected in series Same whether they are connected in series or in parallel ANSWER DOWNLOAD EXAMIANS APP
Chemical Reaction Engineering For a tubular flow reactor with uniform concentration and temperature, the independent variable is Time Length None of these Diameter Time Length None of these Diameter ANSWER DOWNLOAD EXAMIANS APP