System Analysis and Design Which of the following is not true of the conversion phase of the development life cycle? the non machine components of the system should be considered documentation should be emphasized steps must be taken to phase out the old system the user and systems personnel must work closely together the non machine components of the system should be considered documentation should be emphasized steps must be taken to phase out the old system the user and systems personnel must work closely together ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Which of the following statements is not true None of these All of these pointers are useful in traversing a linked list at example of a hierarchical data structure is tree a checksum digit is used for detecting Errors in data transmission None of these All of these pointers are useful in traversing a linked list at example of a hierarchical data structure is tree a checksum digit is used for detecting Errors in data transmission ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design The rule(s) to follow in constructing decision tables is (are): the logic of the table is independent of the sequence in which conditions rules are written, but the action takes place in the order is which the events occur. all of the listed here standardized language must be used consistently. a decision should be given a name the logic of the table is independent of the sequence in which conditions rules are written, but the action takes place in the order is which the events occur. all of the listed here standardized language must be used consistently. a decision should be given a name ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Which of the following is not a factor in the failure of a systems development project ? continuation of a project that should have been cancelled failure of systems integration inadequate user involvement None of these size of company continuation of a project that should have been cancelled failure of systems integration inadequate user involvement None of these size of company ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design The procedure for evaluating the relative performance of different computers, is done by the process called None of these bench marking All of these sequential processing batch processing None of these bench marking All of these sequential processing batch processing ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design The longest method of conversion is parallel None of these phased direct pilot parallel None of these phased direct pilot ANSWER DOWNLOAD EXAMIANS APP