System Analysis and Design
Which of the following is not a factor in the failure of a systems development project ?

size of company
None of these
continuation of a project that should have been cancelled
failure of systems integration
inadequate user involvement

ANSWER DOWNLOAD EXAMIANS APP

System Analysis and Design
Acceptance testing is

running the system with line data by the actual user
testing changes made in an existing or a new program
making sure that the new programs do in fact process certain transactions according to Specifications
is checking the logic of one or more programs in the candidate systems

ANSWER DOWNLOAD EXAMIANS APP