System Analysis and Design Which of the following is done in order a data in phase 1 of the system development life cycle? reviewing policies and procedures None of these conducting interviews using questionnaires to conduct surveys. All of these reviewing policies and procedures None of these conducting interviews using questionnaires to conduct surveys. All of these ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design During what phase, the requirement analysis is performed? None of these system design phase system analysis phase system development phase system investigation phase None of these system design phase system analysis phase system development phase system investigation phase ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Which of the following is not a characteristic of structured system development? None of these partitioning of systems into manageable levels of detail All of these the use of graphical tools, such as data-flow diagrams, to model system specification of the interfaces between modules None of these partitioning of systems into manageable levels of detail All of these the use of graphical tools, such as data-flow diagrams, to model system specification of the interfaces between modules ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Which of the following appropriately explains the desirable characteristic of good system design? Modular approach Long discussions Conversion Proper documentation Modular approach Long discussions Conversion Proper documentation ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Which of the following decides which systems development projects to work on first ? steering committee systems flowcharts data diagram project dictionary None of these steering committee systems flowcharts data diagram project dictionary None of these ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Which of the following is not a factor in the failure of a systems development project ? inadequate user involvement size of company continuation of a project that should have been cancelled None of these failure of systems integration inadequate user involvement size of company continuation of a project that should have been cancelled None of these failure of systems integration ANSWER DOWNLOAD EXAMIANS APP