System Analysis and Design Which of the following decides which systems development projects to work on first ? systems flowcharts data diagram steering committee None of these project dictionary systems flowcharts data diagram steering committee None of these project dictionary ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design The two classifications of inputs are maintenance and signal energies and maintenance maintenance and waste products and waste maintenance and signal energies and maintenance maintenance and waste products and waste ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design A branch office, location or other data processing centres, where a newly developed system is used under normal operating conditions for several months, to test it, is called beta test data string test data system test data alpha test data beta test data string test data system test data alpha test data ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Data structuring is refined through a process called structuring process hierarchical structure None of these normalization Relation structure structuring process hierarchical structure None of these normalization Relation structure ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Which of the following is not considered a tool at the system Design phase? System Flowchart None of these Decision Table Pie chart Data-Flow Diagram System Flowchart None of these Decision Table Pie chart Data-Flow Diagram ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design A file containing multiple indices to the data is called a/an inverted file sequential file indexed file indexed-sequential file inverted file sequential file indexed file indexed-sequential file ANSWER DOWNLOAD EXAMIANS APP