Docks and Harbor Engineering Which of the following conditions of loading imposes the greatest load on the foundation in case of dry docks? When the dock is dry and is under construction When the dock is empty with the ship of maximum tonnage When the dock is empty When the dock is full of water When the dock is dry and is under construction When the dock is empty with the ship of maximum tonnage When the dock is empty When the dock is full of water ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Consider the following statements in regard to Beaufort scale for wind speeds,(i) The Beaufort number ranges from 1 to 12.(ii) Higher Beaufort number indicates higher speed of wind,(iii) Beaufort number for calm is smallest and for hurricane is highest Of these statements (i) and (ii) are correct (i), (ii) and (iii) are correct (ii) and (iii) are correct (i) and (iii) are correct (i) and (ii) are correct (i), (ii) and (iii) are correct (ii) and (iii) are correct (i) and (iii) are correct ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering A ship is berthed in a chamber and lifted by principles of buoyancy Such a chamber is called. Wet dock Floating dock Dry dock Refuge dock Wet dock Floating dock Dry dock Refuge dock ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Assertion A : Marine structures are made specially bulky and strong.Reason R : Sea insects result in undermining of the hardest and the soundest building material. Select your answer based on the coding system given below: Both A and R are true but R is not the correct explanation of A. Both A and R are true and R is the correct explanation of A. A is true but R is false. A is false but R is true. Both A and R are true but R is not the correct explanation of A. Both A and R are true and R is the correct explanation of A. A is true but R is false. A is false but R is true. ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Minimum width of ship clearance shall be (where “B” is beam of the design vessel) 50 m 1.5 B or 50 m B or 30 m 1.5 B 50 m 1.5 B or 50 m B or 30 m 1.5 B ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Which of the following type of sea walls results in greatest protection of shore structures? sea wall with concave face vertical sea wall stepped sea wall sea wall with batter sea wall with concave face vertical sea wall stepped sea wall sea wall with batter ANSWER DOWNLOAD EXAMIANS APP