Docks and Harbor Engineering Which of the following conditions of loading imposes the greatest load on the foundation in case of dry docks? When the dock is empty When the dock is full of water When the dock is dry and is under construction When the dock is empty with the ship of maximum tonnage When the dock is empty When the dock is full of water When the dock is dry and is under construction When the dock is empty with the ship of maximum tonnage ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Consider the following statements.(i) Fender is the cushion provided on the face of the jetty for ships to come in contact,(ii) Slip is the space of water area between two adjacent piers where ships are berthed,(iii) Pier head is a structure constructed near the tip of a break water near the harbour entrance. Of the statements (i) and (ii) are correct (ii) and (iii) are correct (i), (ii) and (iii) are correct (i) and (iii) are correct (i) and (ii) are correct (ii) and (iii) are correct (i), (ii) and (iii) are correct (i) and (iii) are correct ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering In a two lane channel, bottom width of channel is given by Manoeuvring lane + (2 × Bank clearance lane) + ship clearance lane (2 × Manoeuvring lane) + (2 × Bank clearance lane) (2 × Manoeuvring lane) + (2 × Bank clearance lane + ship clearance lane) Manoeuvring lane + (2 × Bank clearance lane) Manoeuvring lane + (2 × Bank clearance lane) + ship clearance lane (2 × Manoeuvring lane) + (2 × Bank clearance lane) (2 × Manoeuvring lane) + (2 × Bank clearance lane + ship clearance lane) Manoeuvring lane + (2 × Bank clearance lane) ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Which of the following are repair docks ? wet docks, lift docks, marine railways, dry docks wet docks, floating docks, lift docks, marine railways marine railways, dry docks, floating docks, wet docks dry docks, wet docks, floating docks, lift docks wet docks, lift docks, marine railways, dry docks wet docks, floating docks, lift docks, marine railways marine railways, dry docks, floating docks, wet docks dry docks, wet docks, floating docks, lift docks ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering By increasing the rise of lock-gates, (i) The length of the lock gate will increase (ii) Transverse stress due to water pressure on the gate will increase (iii) Compressive force on the gate will increase (i) and (iii) are correct Only (iii) is correct Only (ii) is correct (i) and (ii) are correct (i) and (iii) are correct Only (iii) is correct Only (ii) is correct (i) and (ii) are correct ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Which of the following structures are constructed parallel to shore line to develop a demarcating line between land area and water area? Bulk heads, revetments and groynes Sea walls, bulk heads and groynes Sea walls, bulk heads and revetments Sea walls, revetments and groynes Bulk heads, revetments and groynes Sea walls, bulk heads and groynes Sea walls, bulk heads and revetments Sea walls, revetments and groynes ANSWER DOWNLOAD EXAMIANS APP