Docks and Harbor Engineering Which of the following conditions of loading imposes the greatest load on the foundation in case of dry docks? When the dock is empty When the dock is empty with the ship of maximum tonnage When the dock is dry and is under construction When the dock is full of water When the dock is empty When the dock is empty with the ship of maximum tonnage When the dock is dry and is under construction When the dock is full of water ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering The maximum harbour depth below lowest low water is generally equal to(i) loaded draft + 1.2 m when bottom is rock(ii) loaded draft + 1.8 m when bottom is soft(iii) loaded draft + 1.2 m when bottom is soft(iv) loaded draft + 1.8 m when bottom is rock (i) and (ii) are correct (iii) and (iv) are correct (ii) and (iv) are correct (i) and (iii) are correct (i) and (ii) are correct (iii) and (iv) are correct (ii) and (iv) are correct (i) and (iii) are correct ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Consider the following statements.(i) Fender is the cushion provided on the face of the jetty for ships to come in contact,(ii) Slip is the space of water area between two adjacent piers where ships are berthed,(iii) Pier head is a structure constructed near the tip of a break water near the harbour entrance. Of the statements (i), (ii) and (iii) are correct (i) and (iii) are correct (ii) and (iii) are correct (i) and (ii) are correct (i), (ii) and (iii) are correct (i) and (iii) are correct (ii) and (iii) are correct (i) and (ii) are correct ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering In a two lane channel, bottom width of channel is given by (2 × Manoeuvring lane) + (2 × Bank clearance lane) Manoeuvring lane + (2 × Bank clearance lane) + ship clearance lane (2 × Manoeuvring lane) + (2 × Bank clearance lane + ship clearance lane) Manoeuvring lane + (2 × Bank clearance lane) (2 × Manoeuvring lane) + (2 × Bank clearance lane) Manoeuvring lane + (2 × Bank clearance lane) + ship clearance lane (2 × Manoeuvring lane) + (2 × Bank clearance lane + ship clearance lane) Manoeuvring lane + (2 × Bank clearance lane) ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Which of the following are repair docks ? marine railways, dry docks, floating docks, wet docks wet docks, lift docks, marine railways, dry docks dry docks, wet docks, floating docks, lift docks wet docks, floating docks, lift docks, marine railways marine railways, dry docks, floating docks, wet docks wet docks, lift docks, marine railways, dry docks dry docks, wet docks, floating docks, lift docks wet docks, floating docks, lift docks, marine railways ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering If H is the height of the wave expected, then the height of the breakwater is generally taken as 1.2 H to 1.25 H above the datum 1.2 H to 1.25 H above the mean sea level 1.2 H to 1.25 H above the low water level 1.2 H to 1.25 H above the high water level 1.2 H to 1.25 H above the datum 1.2 H to 1.25 H above the mean sea level 1.2 H to 1.25 H above the low water level 1.2 H to 1.25 H above the high water level ANSWER DOWNLOAD EXAMIANS APP