Automation System When was the first successful industrial robot installed in the General Motors Plant in USA? 1961 1967 None of these 1960 1963 1961 1967 None of these 1960 1963 ANSWER DOWNLOAD EXAMIANS APP
Automation System Several objectives are required to achieve a successful data base management program. These are availability of data, quality of data, and transmission of data compatibility of data desirability of data up-to-date data None of these transmission of data compatibility of data desirability of data up-to-date data None of these ANSWER DOWNLOAD EXAMIANS APP
Automation System What is offset error? the difference between the sensor input and the absolute sensed parameter. the difference between the controller output and the setting of the manipulated variable. All of these the difference between the control setpoint value and the actual value. None of these the difference between the sensor input and the absolute sensed parameter. the difference between the controller output and the setting of the manipulated variable. All of these the difference between the control setpoint value and the actual value. None of these ANSWER DOWNLOAD EXAMIANS APP
Automation System A disadvantage of Numerical Control (NC) is: the computer is not reliable the machine tool can easily overheat the tape and tape reader are not reliable one operator is needed for each machine. None of these the computer is not reliable the machine tool can easily overheat the tape and tape reader are not reliable one operator is needed for each machine. None of these ANSWER DOWNLOAD EXAMIANS APP
Automation System If the present value in a timer in the TI510 is 8, how many milliseconds is required from the time the timer is started until the output is enabled? 133.36 1275.41 18 149.88 None of these 133.36 1275.41 18 149.88 None of these ANSWER DOWNLOAD EXAMIANS APP
Automation System In the operation of a programmable controller: All of these None of these all of the logic status is maintained in memory mathematics cannot be performed any latched data must be done using an external latching relay All of these None of these all of the logic status is maintained in memory mathematics cannot be performed any latched data must be done using an external latching relay ANSWER DOWNLOAD EXAMIANS APP