Waste Water Engineering In a sludge tank, the gas mainly produced, is Carbon dioxide Nitrogen Hydrogen Oxygen Carbon dioxide Nitrogen Hydrogen Oxygen ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A five day B.O.D. at 15°C of the sewage of a town is 100 kg/day. If the 5 day B.O.D. per head at 15°C for standard sewage is 0.1 kg/day, the population equivalent is 1000 5000 100 10000 1000 5000 100 10000 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The gas which may cause explosion in sewers, is Ammonia Methane Carbondioxide Carbon monoxide Ammonia Methane Carbondioxide Carbon monoxide ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sludge banks are formed if sewage is disposed of in Rivers Lakes Seas None of these Rivers Lakes Seas None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The rate of accumulation of sludge in septic tanks is recommended as 30 litres/person/year 30 litres/person/month 25 litres/person/month 25 litres/person/year 30 litres/person/year 30 litres/person/month 25 litres/person/month 25 litres/person/year ANSWER DOWNLOAD EXAMIANS APP