Engineering Drawing This should show what changes were made, when, and by whom: Portable document Revision drawings Record of revisions Title form Portable document Revision drawings Record of revisions Title form ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing In this type of dimensioning, allowance must be made for bends: Datum Tolerance Angular Sheet metal Datum Tolerance Angular Sheet metal ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing An oil refinery relies on which type of drafter to maintain and update the technical piping drawings used for the construction and maintenance of the facility. Electrical Architectural Process piping Civil Electrical Architectural Process piping Civil ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing The Free Orbit tool is found on the ________ toolbar. Rotate 3-D Move Move Modify Rotate 3-D Move Move Modify ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing Given a situation in which the drafter has crossed extension lines in a drawing what can be done to clean up the point of crossing? Use the Modify tool to clean up the extension lines Use the Break tool to clean up the extension lines Use the stretch tool to clean up the extension lines Use the Tolerance tool to clean up the extension lines Use the Modify tool to clean up the extension lines Use the Break tool to clean up the extension lines Use the stretch tool to clean up the extension lines Use the Tolerance tool to clean up the extension lines ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing When using the direct entry method to create a horizontal line exactly three inches long the drafter should ________ first. Enter 3 for the length of the line Pull the line from away from the starting point very carefully Insure that Ortho is on Read the coordinate position on the Dynamic Readout Enter 3 for the length of the line Pull the line from away from the starting point very carefully Insure that Ortho is on Read the coordinate position on the Dynamic Readout ANSWER DOWNLOAD EXAMIANS APP