Power Systems Thermal shielding is provided to All of these protected the operating personal from exposure to radiations. absorb the fast neutron. prevent the reactor wall from getting heated. All of these protected the operating personal from exposure to radiations. absorb the fast neutron. prevent the reactor wall from getting heated. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive sequence reactance will be equal to negative sequence if the equipment is motor. transformer and transmission lines. generator. none of these. motor. transformer and transmission lines. generator. none of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems One fission of U235 releases energy of 335 MeV. 525 MeV. 200 MeV. 435 MeV. 335 MeV. 525 MeV. 200 MeV. 435 MeV. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A load centre is at an equidistant from the two thermal generating stations G1 and G2. The fuel cost characteristics of the generating stations are given by F1 = a + bP1 + cP²1 F2 = a + b P2 + 2cP²2 Where P1 and P2 are the generation in MW of G1 and G2, respectively. For most economic generation to meet 300 MW of load, P1 and P2 respectively, are 150, 150 200, 100 100, 200 175, 125 150, 150 200, 100 100, 200 175, 125 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Mechanical energy is supplied to a DC generator at the rate of 4200 J / S. The generator delivers 32.2 Amp at 120 V. How much energy is cost per minute of operation 23060 J. 25060 J. 20160 J. 20060 J. 23060 J. 25060 J. 20160 J. 20060 J. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The ratio of reset to pick up current for an induction cup relay is approximately 1.35. 1.0. 0.99. 0.75. 1.35. 1.0. 0.99. 0.75. ANSWER DOWNLOAD EXAMIANS APP