System Analysis and Design The Turnaround is the elapsed time between the receipt of the input and the availability of the output a program statement that violates one or more rules of the language in which it is written a group of related fields None of these the key information of programming the elapsed time between the receipt of the input and the availability of the output a program statement that violates one or more rules of the language in which it is written a group of related fields None of these the key information of programming ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Which of the following is not considered as a tool at the system design phase? data-flow diagram piechart systems flowchart decision table data-flow diagram piechart systems flowchart decision table ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design The advantage of Purchase Option is (are) the flexibility of modifying the system at will No financing is requird. The risk of system obsolescence is shifted to the lessor Insurances, maintenance, and other expenses are included in the rental charge None of these All of these the flexibility of modifying the system at will No financing is requird. The risk of system obsolescence is shifted to the lessor Insurances, maintenance, and other expenses are included in the rental charge None of these All of these ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design The combination of the top-down and the bottom-up approach may be referred to as an integrative approach interactive approach None of these interpretive approach both b and c integrative approach interactive approach None of these interpretive approach both b and c ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design The _____ symbol is used in a flowchart to represent a step that gets information from the user. Start/Stop Input/Output Process Selection/repetition Start/Stop Input/Output Process Selection/repetition ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Requirements also serve as an evaluation checklist at the end of the development project, so they are sometimes called _____. System Development Life Cycle Phased Conversion Success factors Move of the above. CASE tool System Development Life Cycle Phased Conversion Success factors Move of the above. CASE tool ANSWER DOWNLOAD EXAMIANS APP