Engineering Drawing The text height for room names should be set to ________for a drawing that will be plotted to a scale of ¼" = 1'-0". 4" 8" 5" 6" 4" 8" 5" 6" ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing In working drawings, these show all necessary information not given directly on the drawing with its dimensions and notes: Formatting forms Portable documents Document strips Title and record strips Formatting forms Portable documents Document strips Title and record strips ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing When using the direct entry method to create a horizontal line exactly three inches long the drafter should ________ first. Pull the line from away from the starting point very carefully Insure that Ortho is on Read the coordinate position on the Dynamic Readout Enter 3 for the length of the line Pull the line from away from the starting point very carefully Insure that Ortho is on Read the coordinate position on the Dynamic Readout Enter 3 for the length of the line ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing These drawings are given to contractors to perform work or manufacture individual parts: Working drawings 3D drawings Assembly details Skeleton assemblies Working drawings 3D drawings Assembly details Skeleton assemblies ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing This is a conical-shaped recess around a hole, often used to receive a tapered screw head: Countersink Spot-face Counter-bore Boss Countersink Spot-face Counter-bore Boss ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing These are used to attach parts to a cylinder so they won't turn on it: Knurls and keys Key-seats and bearings Keys and key-ways/key-seats Lugs and bearings Knurls and keys Key-seats and bearings Keys and key-ways/key-seats Lugs and bearings ANSWER DOWNLOAD EXAMIANS APP