System Analysis and Design
The systems conversion technique of totally removing the existing system and immediately implementing the new system is called a

phased conversion
None of these
parallel run
pilot conversion
crash conversion

ANSWER DOWNLOAD EXAMIANS APP

System Analysis and Design
Unit testing is

is checking the logic of one or more programs in the candidate system
running the system with line data by the actual user
making sure that the new programs do in fact process certain transactions according to Specifications
None of these
testing changes made in an existing or a new program

ANSWER DOWNLOAD EXAMIANS APP

System Analysis and Design
Which of the following is not a characteristic of structured system development?

specification of the interfaces between modules
the use of graphical tools, such as data-flow diagrams, to model system
partitioning of systems into manageable levels of detail
All of these
None of these

ANSWER DOWNLOAD EXAMIANS APP

System Analysis and Design
The black-box concept:

All of these
is invoked by describing a system in terms of inputs and outputs, leaving the transformation process a black box.
assumes that inputs and outputs will remain stable
assumes that the black box is independent
None of these

ANSWER DOWNLOAD EXAMIANS APP