Concrete Technology and Design of Concrete Structures The strength of concrete after one year as compared to 28 days strength is about 25 to 50% more 20 to 25% more 15 to 20% more 10 to 15% more 25 to 50% more 20 to 25% more 15 to 20% more 10 to 15% more ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures In counterfort type retaining walls i) the vertical slab is designed as a continuous slab ii) the heel slab is designed as a continuous slab iii) the vertical slab is designed as a cantilever iv) the heel slab is designed as a cantilever The correct answer is (ii) and (iii) (iii) and (iv) (i) and (iv) (i) and (ii) (ii) and (iii) (iii) and (iv) (i) and (iv) (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures Examine the following statements :i) Factor of safety for steel should be based on its yield stress,ii) Factor of safety for steel should be based on its ultimate stress,iii) Factor of safety for concrete should be based on its yield stress,iv) Factor of safety for concrete should be based on its ultimate stress.The correct statements are (i) and (iv) (i) and (iii) (ii) and (iv) (ii) and (iii) (i) and (iv) (i) and (iii) (ii) and (iv) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures Select the incorrect statement... The loss of prestress is more in pre-tensioning system than in post-tensioning system. Pretensioning system has greater certainty about its durability. None of these For heavy loads and large spans in buildings or bridges, post-tensioning system is cheaper than pretensioning system The loss of prestress is more in pre-tensioning system than in post-tensioning system. Pretensioning system has greater certainty about its durability. None of these For heavy loads and large spans in buildings or bridges, post-tensioning system is cheaper than pretensioning system ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures For walls, columns and vertical faces of all structural members, the form work is generally removed after 3 days 24 to 48 hours 14 days 7 days 3 days 24 to 48 hours 14 days 7 days ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures The load factors for live load and dead load are taken respectively as 1.5 and 1.5 2.2 and 2.2 2.2 and 1.5 1.5 and 2.2 1.5 and 1.5 2.2 and 2.2 2.2 and 1.5 1.5 and 2.2 ANSWER DOWNLOAD EXAMIANS APP