Building Maintenance The slope of a ramp should not be more than: 1 in 35 1 in 10 1 in 15 1 in 20 1 in 35 1 in 10 1 in 15 1 in 20 ANSWER DOWNLOAD EXAMIANS APP
Building Maintenance In prestressed concrete structures the primary problem is damaged caused to ____________ Spans Bridge decks Ridges Anchorages Spans Bridge decks Ridges Anchorages ANSWER DOWNLOAD EXAMIANS APP
Building Maintenance In the case of dormant cracks wider than about 1m, it is more economical to use ____________ Ranging Tensioning Epoxy resin Grouting Ranging Tensioning Epoxy resin Grouting ANSWER DOWNLOAD EXAMIANS APP
Building Maintenance PSC stands for: Pre-Stressed Concrete Pre-strained Concrete Post-Strained Concrete Post-Stressed Concrete Pre-Stressed Concrete Pre-strained Concrete Post-Strained Concrete Post-Stressed Concrete ANSWER DOWNLOAD EXAMIANS APP
Building Maintenance The main reason for cracks in masonry joints is: Sodium Moisture Magnesium Sulphate Sodium Moisture Magnesium Sulphate ANSWER DOWNLOAD EXAMIANS APP
Building Maintenance If the loss of prestress is excessive resulting in tensile cracks, which method should be used? Layered method Transparent method Hollow method Preloading method Layered method Transparent method Hollow method Preloading method ANSWER DOWNLOAD EXAMIANS APP