Building Maintenance __________ is used to construct very thin, hard and strong surface. R.C.C. PCC Ferro-Cement PSC R.C.C. PCC Ferro-Cement PSC ANSWER DOWNLOAD EXAMIANS APP
Building Maintenance If the soil is dry, DPC for ground floor consists of the layer of: Fine Sand Concrete Coarse Sand Metal Fine Sand Concrete Coarse Sand Metal ANSWER DOWNLOAD EXAMIANS APP
Building Maintenance In prestressed concrete structures the primary problem is damaged caused to ____________ Ridges Anchorages Bridge decks Spans Ridges Anchorages Bridge decks Spans ANSWER DOWNLOAD EXAMIANS APP
Building Maintenance In method 3 the restoration is done by addition of ____________ Aluminium jacket Metal sleeve jacket Steel jacket Water proof jacket Aluminium jacket Metal sleeve jacket Steel jacket Water proof jacket ANSWER DOWNLOAD EXAMIANS APP
Building Maintenance Bridge girders located in zones of very severe exposure conditions suffer ____________ Bleeding Winding Spinning Spalling Bleeding Winding Spinning Spalling ANSWER DOWNLOAD EXAMIANS APP
Building Maintenance At roof slab level over the DPC, __________ are provided. P.C.C Tiles Rubber Sheet Concrete P.C.C Tiles Rubber Sheet Concrete ANSWER DOWNLOAD EXAMIANS APP