• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Building Maintenance

Building Maintenance
At roof slab level over the DPC, __________ are provided.

Rubber Sheet
P.C.C
Concrete
Tiles

ANSWER DOWNLOAD EXAMIANS APP

Building Maintenance
Shear cracks between the main wall and cross wall can be corrected using:

Toothing
Rebuilding
Grouting
Guining

ANSWER DOWNLOAD EXAMIANS APP

Building Maintenance
The main reason for cracks in masonry joints is:

Moisture
Sodium
Sulphate
Magnesium

ANSWER DOWNLOAD EXAMIANS APP

Building Maintenance
R.C.C. was developed and first used by:

Joseph Monier
Francois Coignet
Joseph Asphadin
John Smeaton

ANSWER DOWNLOAD EXAMIANS APP

Building Maintenance
In case of bridge greater than 10.7m in height and which cannot be inspected from beneath due to watery situation the instrument suited for inspection work is?

Rain guages
Strain gauges
Electrical resistance meter
Barins snooper vehicle

ANSWER DOWNLOAD EXAMIANS APP

Building Maintenance
The compression in PSC is done by _________ of high-strength tendons.

Compression
Tensioning
Bending
Shearing

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Maintenance

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑