The capacity factor is the ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period. Nuclear power plants are at the high end of the range of capacity factors
For the cut-in speed is the point at which the wind turbine is able to generate power. Between the cut-in speed and the rated speed, where the maximum output is reached, the power output will increase cubically with wind speed. Pmax directly propotional to cubical of wind speed. So, by double the speed of wind power will be increased by 8 times.
Bus Type - Known Parameter - Unknown Parameter Load Bus -P, Q - V, phase angle Generator Bus - P, V (magnitude) - Q, Voltage phase angle Slack Bus Voltage - magnitude and phase angle - P, Q
The tendency of a Reach of Distance Relay to operate at impedance larger than its setting value is known as overreach. Overreach is the presence of d.c. offset in the fault current wave, as the offset current has a higher peak value than that of a symmetrical wave for which the relay is set.