Industrial Engineering and Production Management The routing function in a production system design is concerned with Optimizing material flow through the plant Machine utilization Manpower utilization Quality assurance of the product Optimizing material flow through the plant Machine utilization Manpower utilization Quality assurance of the product ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management One time measurement unit (TMU) in method time measurement system equals 0.006 minute 0.0001 minute 0.001 minute 0.0006 minute 0.006 minute 0.0001 minute 0.001 minute 0.0006 minute ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If ‘F’ is the fixed cost, ‘V’ is the variable cost per unit (or total variable costs) and ‘P’ is the selling price of each unit (or total sales value), then break-even point is equal to (F × V)/P (F × P)/V F/[1 - (V/P)] F/[1 + (V/P)] (F × V)/P (F × P)/V F/[1 - (V/P)] F/[1 + (V/P)] ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The break-even point represents Time when industry will undergo loss The most economical level of operation of any industry The time when unit can run without any loss and profit The time when company can make maximum profits Time when industry will undergo loss The most economical level of operation of any industry The time when unit can run without any loss and profit The time when company can make maximum profits ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following is independent of sales forecast? Production planning Productivity Inventory control Production control Production planning Productivity Inventory control Production control ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management According to Rowan plan of wage incentive system, bonus is paid to a worker Whose output exceeds 67% efficiency On the percentage of time worked On the percentage of standard time On the percentage of time saved Whose output exceeds 67% efficiency On the percentage of time worked On the percentage of standard time On the percentage of time saved ANSWER DOWNLOAD EXAMIANS APP