Irrigation Engineering The ratio of average values of shear stresses produced on the bed and the banks of a channel due to flowing water is equal to 1 equal to zero greater than 1 less than 1 equal to 1 equal to zero greater than 1 less than 1 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Finally formed berms in canals are provided for Control of seepage losses Protection of banks erosion by the waves All of these Strengthening of banks Control of seepage losses Protection of banks erosion by the waves All of these Strengthening of banks ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The velocity of drainage water in the barrels of a syphon-aqueduct, is normally limited to 4 to 5 m per second 1 to 2 m per second 3 to 4 m per second 2 to 3 m per second 4 to 5 m per second 1 to 2 m per second 3 to 4 m per second 2 to 3 m per second ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Side slopes generally kept for canals in loam soil, are: Neither (A) nor (B) 1 : 1 in cutting and 1½ : 1 in filling 1½ : 1 in cutting and 2 : 1 in filling Both (A) and (B) Neither (A) nor (B) 1 : 1 in cutting and 1½ : 1 in filling 1½ : 1 in cutting and 2 : 1 in filling Both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering As compared to crest of the normal portion of the weir, the crest of the under sluice portion of weir is kept at same level higher level lower level any of the above depending on the design same level higher level lower level any of the above depending on the design ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In a syphon aqueduct Drainage passes over the canal and F.S.L. of the canal is below the bottom of the drainage trough Canal passes over the drainage and H.F.L. of the drainage is above the bottom of the canal trough Drainage passes over the canal and F.S.L. of the canal is above the bottom of the drainage trough Canal passes over the drainage and H.F.L. of the drainage is below the bottom of the canal trough Drainage passes over the canal and F.S.L. of the canal is below the bottom of the drainage trough Canal passes over the drainage and H.F.L. of the drainage is above the bottom of the canal trough Drainage passes over the canal and F.S.L. of the canal is above the bottom of the drainage trough Canal passes over the drainage and H.F.L. of the drainage is below the bottom of the canal trough ANSWER DOWNLOAD EXAMIANS APP