Concrete Technology and Design of Concrete Structures
Select the incorrect statement...

None of these
For heavy loads and large spans in buildings or bridges, post-tensioning system is cheaper than pretensioning system
The loss of prestress is more in pre-tensioning system than in post-tensioning system.
Pretensioning system has greater certainty about its durability.

ANSWER DOWNLOAD EXAMIANS APP

Concrete Technology and Design of Concrete Structures
Minimum pitch of transverse reinforcement in a column is

sixteen times the smallest diameter of longitudinal reinforcement bar to be tied
forty-eight times the diameter of transverse reinforcement
the least lateral dimension of the member
lesser of the above three values

ANSWER DOWNLOAD EXAMIANS APP