Let breadth = b meters. then, length = 3b/2 meters ? b x 3b/2 = 2/3 X 10000? b2 = (4 x 10000)/9? b = ( 2 X 100)/3 m ? Length = (3/2) x (2/3) x 100 m= 100 m
perimeter = total cost / cost per m = 10080 /20 = 504mside of the square = 504/4 = 126mbreadth of the pavement = 3mside of inner square = 126 - 6 = 120marea of the pavement = (126 x126) - (120 x 120) = 246 x 6 sq mcost of pavement = 246*6*50 = Rs. 73800
Length of carpet = Total Cost / Rate = 3600 / 30 = 120 mArea of carpet = (120 x 75) / 100 m2= 90 m2? Area of the room = 90 m2Breadth of the room = Area /Length = 90 / 15 m = 6m