GETCO Exam Paper (30-11-2008) The number of pilot wires required for protecting 3-phase transmission lines using Translay System of protection is 2 6 4 3 2 6 4 3 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The planning Commission was set up in January, 1948 March,1950 April, 1947 September, 1947 January, 1948 March,1950 April, 1947 September, 1947 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Select the most suitable word from the given choices to fill in the blanks to make the sentence meaningfully complete Yesterday only he promised me to abstain _____ smoking for from with on for from with on ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The power handling capabilities of transmission lines are controlled by load frequency control equipments both (a) & (c ) set by design factors determined by system operators controlled by load frequency control equipments both (a) & (c ) set by design factors determined by system operators ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) In an over current protection, the setting of earth fault relay is _____ the phase fault relay. equal to less than not related in more than equal to less than not related in more than ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The voltage regulation of a transformer at full load and 0.8 power factor lagging is 2.5%. The voltage regulation at full load, 0.8 power factor leading will be 0.01 zero -2.5% 2.5% 0.01 zero -2.5% 2.5% ANSWER DOWNLOAD EXAMIANS APP