GETCO Exam Paper (30-11-2008)

GETCO Exam Paper (30-11-2008)
The number of pilot wires required for protecting 3-phase transmission lines using Translay System of protection is

2
6
4
3

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The planning Commission was set up in

January, 1948
March,1950
April, 1947
September, 1947

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
Select the most suitable word from the given choices to fill in the blanks to make the sentence meaningfully complete

Yesterday only he promised me to abstain _____ smoking

for
from
with
on

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The power handling capabilities of transmission lines are

controlled by load frequency control equipments
both (a) & (c )
set by design factors
determined by system operators

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
In an over current protection, the setting of earth fault relay is _____ the phase fault relay.

equal to
less than
not related in
more than

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The voltage regulation of a transformer at full load and 0.8 power factor lagging is 2.5%. The voltage regulation at full load, 0.8 power factor leading will be

0.01
zero
-2.5%
2.5%

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON GETCO Exam Paper (30-11-2008)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑