GETCO Exam Paper (30-11-2008) The number of pilot wires required for protecting 3-phase transmission lines using Translay System of protection is 6 2 4 3 6 2 4 3 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The planning Commission was set up in April, 1947 September, 1947 March,1950 January, 1948 April, 1947 September, 1947 March,1950 January, 1948 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) On a long high voltage transmission line with heavy load, VAR compensation can be provided by using shunt capacitors series inductive reactors series capacitors shunt inductive reactors shunt capacitors series inductive reactors series capacitors shunt inductive reactors ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) In distance protection, the relay measures _____ impedance of the line from relay up to the fault point. positive sequence self zero sequence negative sequence positive sequence self zero sequence negative sequence ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) If the fault occurs near the relay, the V/I ratio will be _____ that of if the fault occurs away from the relay. higher than none of these equal to lower than higher than none of these equal to lower than ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The arc voltage in a C.B. is _____ with the arc current none of these lagging by 90˚ leading by 90˚ in phase none of these lagging by 90˚ leading by 90˚ in phase ANSWER DOWNLOAD EXAMIANS APP