GETCO Exam Paper (30-11-2008) The number of pilot wires required for protecting 3-phase transmission lines using Translay System of protection is 6 4 2 3 6 4 2 3 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Highest voltage for transmitting electrical power in India is (in 2008) 550 kV 400 kV 765 kV 700 kV 550 kV 400 kV 765 kV 700 kV ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The power handling capabilities of transmission lines are controlled by load frequency control equipments determined by system operators set by design factors both (a) & (c ) controlled by load frequency control equipments determined by system operators set by design factors both (a) & (c ) ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) When transformers or switchgears are to be installed in a transmission line, the poles used are J type L type H type I type J type L type H type I type ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) If a combination of HRC fuse and a C.B. is employed, the C.B. operates for short circuit currents low over load currents under all abnormal currents this combination is never employed in practice short circuit currents low over load currents under all abnormal currents this combination is never employed in practice ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Bulk-oil CBs can be used for voltage upto 1.1 kV 66 kV 33 kV 11 kV 1.1 kV 66 kV 33 kV 11 kV ANSWER DOWNLOAD EXAMIANS APP