GETCO Exam Paper (30-11-2008) The number of pilot wires required for protecting 3-phase transmission lines using Translay System of protection is 4 2 3 6 4 2 3 6 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The voltage regulation of a transformer at full load and 0.8 power factor lagging is 2.5%. The voltage regulation at full load, 0.8 power factor leading will be 0.01 2.5% zero -2.5% 0.01 2.5% zero -2.5% ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The planning Commission was set up in January, 1948 April, 1947 September, 1947 March,1950 January, 1948 April, 1947 September, 1947 March,1950 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The first oil refinery in India was set up at Vishakhapatnam Diboi Barauni Bombay (Mumbai) Vishakhapatnam Diboi Barauni Bombay (Mumbai) ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) In the protection scheme relay functions as _____ device switching sensing none of these breaking switching sensing none of these breaking ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The disadvantage of transmission lines as compared to cables is exposure to atmosphere hazards like smoke, ice, etc. exposure to lightening inductive interference between power communication circuits All of these exposure to atmosphere hazards like smoke, ice, etc. exposure to lightening inductive interference between power communication circuits All of these ANSWER DOWNLOAD EXAMIANS APP