• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

GETCO Exam Paper (30-11-2008)

GETCO Exam Paper (30-11-2008)
The number of pilot wires required for protecting 3-phase transmission lines using Translay System of protection is

6
4
3
2

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
On a long high voltage transmission line with heavy load, VAR compensation can be provided by using

series capacitors
series inductive reactors
shunt inductive reactors
shunt capacitors

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
Burden of the relay is _____ rating of relay

current
voltage
watt
volt-amp.

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
If the +Ve, -Ve & zero sequence reactances of an elements of a power system are 0.3, 0.3 & 0.8 p.u. respectively, the element would be

static load
synchronous generator
transmission line
synchronous motor

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
Supreme Command of all the three wings of the armed forces is vested in the

Defence Minister
President of India
Chief of Army Staff
Prime Minister of India

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The delay fuses are used for protection of

none of these
fluorescent lamp
light circuits
motors

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON GETCO Exam Paper (30-11-2008)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑