GETCO Exam Paper (30-11-2008) The number of pilot wires required for protecting 3-phase transmission lines using Translay System of protection is 3 6 2 4 3 6 2 4 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Interconnected power systems operating with "tie line bias" will respond to frequency changes only tie line load changes only both frequency and tie line load changes tie line voltage changes only frequency changes only tie line load changes only both frequency and tie line load changes tie line voltage changes only ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) In a dry type transformer, accumulation of dust on the windings and core is likely to cause short circuiting of primary winding corrosion of core material short circuiting of secondary winding reduction in heat dissipation short circuiting of primary winding corrosion of core material short circuiting of secondary winding reduction in heat dissipation ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) If the folt current is 2000 A, the relay setting is 50 percent & CT ratio is 400/5, the plug setting multiplier is 10 25 15 50 10 25 15 50 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Select the most suitable word from the given choices to fill in the blanks to make the sentence meaningfully completeIn the camps volunteers served one and all without _____ discretion considertion distinction discrimination discretion considertion distinction discrimination ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The load carrying capability of a long transmission line may be limited by stability considerations is increased at low ambient air temperature both (a) & (b) is always limited by conductor area may be limited by stability considerations is increased at low ambient air temperature both (a) & (b) is always limited by conductor area ANSWER DOWNLOAD EXAMIANS APP