GETCO Exam Paper (30-11-2008)

GETCO Exam Paper (30-11-2008)
The number of pilot wires required for protecting 3-phase transmission lines using Translay System of protection is

3
4
2
6

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The planning Commission was set up in

September, 1947
April, 1947
March,1950
January, 1948

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The arc voltage in a C.B. is _____ with the arc current

lagging by 90˚
in phase
leading by 90˚
none of these

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
Choose the word which is most nearly the OPPOSITE in meaning
INVINCIBLE

harmonious
conquerable
unsurmountable
beleaguered

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
Choose the word which is most nearly the SAME in meaning
cherish

damage
nourish
nurture
detriment

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
Minimum oil C.B. use oil for

insulation
cooling
lubrication
arc quenching

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON GETCO Exam Paper (30-11-2008)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑