GETCO Exam Paper (30-11-2008)

GETCO Exam Paper (30-11-2008)
The number of pilot wires required for protecting 3-phase transmission lines using Translay System of protection is

6
4
2
3

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
Entrance to the Indian Civil Service was made possible for the Indians by

Lord Ripon
Lord Lytton
Lord Dalhousie
Lord Canning

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The delay fuses are used for protection of

fluorescent lamp
light circuits
motors
none of these

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
In a dry type transformer, accumulation of dust on the windings and core is likely to cause

short circuiting of secondary winding
corrosion of core material
reduction in heat dissipation
short circuiting of primary winding

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The power handling capabilities of transmission lines are

set by design factors
controlled by load frequency control equipments
determined by system operators
both (a) & (c )

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The power transmitted will be maximum when

sending end voltage is more
corona losses are least
reactance is high
receiving end voltage is more

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON GETCO Exam Paper (30-11-2008)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑