GETCO Exam Paper (30-11-2008) The number of pilot wires required for protecting 3-phase transmission lines using Translay System of protection is 2 6 4 3 2 6 4 3 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Entrance to the Indian Civil Service was made possible for the Indians by Lord Canning Lord Dalhousie Lord Lytton Lord Ripon Lord Canning Lord Dalhousie Lord Lytton Lord Ripon ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Isolaters used in transmission lines are capable of breaking fault current no current load current charging current fault current no current load current charging current ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The first battle of Panipat was fought in the year 1526 AD 1296 AD 1542 AD 1556 AD 1526 AD 1296 AD 1542 AD 1556 AD ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The voltage regulation of a transformer at full load and 0.8 power factor lagging is 2.5%. The voltage regulation at full load, 0.8 power factor leading will be zero 0.01 -2.5% 2.5% zero 0.01 -2.5% 2.5% ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) When a star delta transformer bank of three single phase transformers is to be used for step down transformation with line voltages of 23000 V and 2300 V, the ratio of transformation will be 5.8:1 10.0:1 17.2:1 12.1:1 5.8:1 10.0:1 17.2:1 12.1:1 ANSWER DOWNLOAD EXAMIANS APP