The number of pilot wires required for protecting 3-phase transmission lines using Translay System of protection is

4
2
3
6

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The voltage regulation of a transformer at full load and 0.8 power factor lagging is 2.5%. The voltage regulation at full load, 0.8 power factor leading will be

0.01
2.5%
zero
-2.5%

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The planning Commission was set up in

January, 1948
April, 1947
September, 1947
March,1950

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The first oil refinery in India was set up at

Vishakhapatnam
Diboi
Barauni
Bombay (Mumbai)

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
In the protection scheme relay functions as _____ device

switching
sensing
none of these
breaking

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The disadvantage of transmission lines as compared to cables is

exposure to atmosphere hazards like smoke, ice, etc.
exposure to lightening
inductive interference between power communication circuits
All of these

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON GETCO Exam Paper (30-11-2008)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑