Irrigation Engineering The most suitable location of a canal head work, is Boulders stage of the river Trough stage of the river Delta stage of the river Rock stage of the river Boulders stage of the river Trough stage of the river Delta stage of the river Rock stage of the river ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The duty is largest at the head of a main canal same at all places at the head of water course on the field at the head of a main canal same at all places at the head of water course on the field ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For diversion of flood water of rivers, the type of canal constructed, is Ridge canal Perennial canal Canal Inundation canal Ridge canal Perennial canal Canal Inundation canal ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The useful moisture of soil, is equal to its Moisture content at permanent wilting point Field capacity Saturation capacity Difference between filed capacity and permanent wilting point within the root zone of plants Moisture content at permanent wilting point Field capacity Saturation capacity Difference between filed capacity and permanent wilting point within the root zone of plants ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In a concrete canal the approximate permissible velocity of water should not exceed 0.5 m/sec 1.5 m/sec 1 m/sec 2 m/sec 0.5 m/sec 1.5 m/sec 1 m/sec 2 m/sec ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For an annual flood series arranged in descending order of magnitude, the return for a magnitude listed at position period m in a total data N is m/N (N+l)/m m/(N+l) N/(m+l) m/N (N+l)/m m/(N+l) N/(m+l) ANSWER DOWNLOAD EXAMIANS APP