Industrial Engineering and Production Management The most suitable incentive plan for the maintenance section of an industry will be Piece rate system Simplification Profit sharing plans Group incentive plan Piece rate system Simplification Profit sharing plans Group incentive plan ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In the Halsey 50-50 plan, the following are rewarded more Past average workers All of the these Past poor workers Past good workers Past average workers All of the these Past poor workers Past good workers ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Standard time is equal to Representative time multiplied by rating factor (Normal time) - (allowances) (Normal time) + (allowances) Normal time taken by an operation Representative time multiplied by rating factor (Normal time) - (allowances) (Normal time) + (allowances) Normal time taken by an operation ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Direct expenses include Factory expenses None of these Administrative expenses Selling expenses Factory expenses None of these Administrative expenses Selling expenses ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which one of the following techniques is used for determining allowances in time study? Work sampling Performance rating Linear regression Acceptance sampling Work sampling Performance rating Linear regression Acceptance sampling ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management When slack of an activity is negative The activity is critical and any delay in its performance will delay the completion of whole project It represents that a programme falls behind schedule and additional resources are required to complete the project in time All of these It represents a situation where extra resources are available and the completion of project is not delayed The activity is critical and any delay in its performance will delay the completion of whole project It represents that a programme falls behind schedule and additional resources are required to complete the project in time All of these It represents a situation where extra resources are available and the completion of project is not delayed ANSWER DOWNLOAD EXAMIANS APP