Irrigation Engineering The maximum permissible eccentricity for no tension at the base of a gravity dam is B/3 B/4 B/6 B/2 B/3 B/4 B/6 B/2 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the intensity of rainfall is more than the infiltration capacity of soil, then the infiltration rate will be more than rate of rainfall equal to rate of rainfall equal to infiltration capacity more than infiltration capacity more than rate of rainfall equal to rate of rainfall equal to infiltration capacity more than infiltration capacity ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The relation between probability (P) and recurrence interval (T) is given by P/T = 1 PT = 1 P/T2 = 1 PT2 = 1 P/T = 1 PT = 1 P/T2 = 1 PT2 = 1 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If L is total length of a canal in kilometers, P is total perimeter of its lining in metres and C is the cost of lining per square metre, the additional expenditure involved on lining, is PLC/1000 PL/1000C PC/100L 100 PLC PLC/1000 PL/1000C PC/100L 100 PLC ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The shape of recession limb of a hydrograph depends upon None of these Basin characteristics only Storm characteristics only Both (A) and (B) None of these Basin characteristics only Storm characteristics only Both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For the upstream face of an earthen dam, the most adverse condition for stability of slope is sloughing of slope sudden drawdown during construction steady seepage sloughing of slope sudden drawdown during construction steady seepage ANSWER DOWNLOAD EXAMIANS APP