Environmental Engineering The main disadvantage of oxidation pond is that Maintenance and operation cost are high None of these BOD removal is very low Large area is required for construction Maintenance and operation cost are high None of these BOD removal is very low Large area is required for construction ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Percentage of bacterial load that can be removed from water by the process of plain sedimentation is about 50 75 59 100 50 75 59 100 ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Most suitable section of sewer in separate sewage system is Modified egg shaped section Rectangular section Circular section Standard form of egg shaped sewer Modified egg shaped section Rectangular section Circular section Standard form of egg shaped sewer ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The correct relation between theoretical oxygen demand (TOD), Biochemical oxygen demand (BOD) and Chemical oxygen demand (COD) is given by COD > BOD > TOD TOD > BOD > COD TOD > COD > BOD BOD > COD > TOD COD > BOD > TOD TOD > BOD > COD TOD > COD > BOD BOD > COD > TOD ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The phenolic compounds in public water supply should not be more than 0.01 ppm 0.0001 ppm 0.1 ppm 0.001 ppm 0.01 ppm 0.0001 ppm 0.1 ppm 0.001 ppm ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering For normal sludge, the value of sludge index for Indian conditions is 50 to 150 0 to 50 150 to 350 350 to 500 50 to 150 0 to 50 150 to 350 350 to 500 ANSWER DOWNLOAD EXAMIANS APP