Economics of Power Generation The lagging reactive power drawn by a load is zero. The power factor of the load is 0.75 0.5 1 None of the listed here 0.75 0.5 1 None of the listed here ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Load factor of a power station is defined as average load x maximum demand average load/maximum demand maximum demand/average load (average load x maximum demand)172 average load x maximum demand average load/maximum demand maximum demand/average load (average load x maximum demand)172 ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Improving the power factor means making it Zero Less than 0.5 Close to unity None of the listed here Zero Less than 0.5 Close to unity None of the listed here ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Which of the following devices may be used to provide protection against lightening over voltages ? All of these Surge absorbers Rod gaps Horn gaps All of these Surge absorbers Rod gaps Horn gaps ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Approximate estimation of power demand can be made by All of the listed here Load survey method Mathematical method Statistical methods All of the listed here Load survey method Mathematical method Statistical methods ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The load factor of domestic load is usually 50 to 60% 60 to 70% 10 to 15% 30 to 40% 50 to 60% 60 to 70% 10 to 15% 30 to 40% ANSWER DOWNLOAD EXAMIANS APP