Economics of Power Generation The drawback of diminishing value method for calculating depreciation is that depreciation charges None of the listed here Are high in later years Are small in early years Are independent of rate of interest None of the listed here Are high in later years Are small in early years Are independent of rate of interest ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation If C is the capacitance per phase for delta connected capacitor bank, then capacitance per phase for star connected the capacitor bank is C/3 C/√3 √3C 3C C/3 C/√3 √3C 3C ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation For a power plant which of the following constitutes running cost? Cost of lubricants All of the listed here Cost of wages Cost of fuel Cost of lubricants All of the listed here Cost of wages Cost of fuel ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The most economical power factor for a consumer is generally 0.95 lagging 1 0.75 lagging 0.6 lagging 0.95 lagging 1 0.75 lagging 0.6 lagging ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Power plant is expected to have the longest life. Hydroelectric Diesel Any of the above Steam Hydroelectric Diesel Any of the above Steam ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation When the plant restors to load shedding it can be conclucted that Daily load factor is unity Diversity factor is zero Plant is under repairs Peak demand is more than the installed capacity Daily load factor is unity Diversity factor is zero Plant is under repairs Peak demand is more than the installed capacity ANSWER DOWNLOAD EXAMIANS APP