DGVCL Exam Paper (11-12-2011)
The insulation coordination for UHV lines (above 500 kV) is done based on

Switching surges
Lightning surges
Lightning and switching surges
Voltage level of the line

ANSWER DOWNLOAD EXAMIANS APP

DGVCL Exam Paper (11-12-2011)
Which of the following correctly represents the sequence of operations of isolator, circiut breaker and earthing switch while opening a circuit?

Close circuit breaker-close isolator - open earthing switch
Open isolator close circuit breaker-open earthing switch
Open circuit breaker-open isolator-close earthing switch
Close earthing switch - open ciruit- breaker-open islotor

ANSWER DOWNLOAD EXAMIANS APP